scspcba
  • Home
  • Online Quote
    • PCB Quote
    • PCBA Quote
    • BOM Service
    • Box Build
  • PCB Services
    • Single Layer PCB
    • Double Layer PCB
    • Multilayer PCB
    • HDI PCB
    • Rigid-Flex PCB
    • High-frequency PCB
    • Ultra-High-Layer PCB
    • Aluminum PCB
    • Ceramic PCB
    • Thick Copper PCB
    • High-Tg PCB
    • Flexible PCB
  • PCBA Services
    • One-Stop PCBA Service
    • OEM/ODM
    • SMT/DIP
    • Testing & Inspection
    • BOM & Supply Chain
    • Solution Development & Technical Support
  • Box Build Assembly
  • Blog
    • Company News
    • Industry FAQ
  • About Us
    • Company Profile
    • service-advantages
    • Certification
    • Quality Management System
    • International Cooperation
  • Contact Us
  • Search
  • Menu Menu

2026 Chinese New Year Shutdown at SCSPCBA: How PCBA Customers Should Prepare

January 15, 2026
  • Share on Facebook
  • Share on X
  • Share on WhatsApp
  • Share on Pinterest
  • Share on LinkedIn
  • Share on Vk

Chinese Lunar New Year (Spring Festival) is the most important traditional festival in Chinese culture, symbolizing bidding farewell to the old year and welcoming the new, family reunion, and hope. During this time, family and friends gather to share delicious food, exchange blessings, and pray for a prosperous year ahead.

As a one-stop service provider with years of experience in PCB board fabrication and PCB assembly manufacturing, SCSPCBA extends its sincere blessings in advance to OEMs, ODMs, engineers, and purchasing partners worldwide:

Wishing you a happy and healthy Spring Festival, a happy family, smooth project progress, seamless mass production, and a thriving business!

If you have PCB/PCBA/Box build assembly projects for Q1 2026, please contact us now to schedule your project.

Click the button below, and our team will assist you in mitigating manufacturing risks and adjusting supply strategies in advance for the Spring Festival.

Contact us to avoid business interruptions during the holiday period

1. SCSPCBA 2026 Chinese New Year Work Stoppage Arrangement

(1) Work Stoppage Time

  • During the 2026 Chinese New Year holiday, SCSPCBA will begin to stop PCB/PCBA production from February 15th (Sunday) to February 23rd (Monday).
  • Production and shipping will resume in full on February 24th.

(2) SCSPCBA Employee Arrangements

The Chinese New Year is the most important time of year for employees to reunite with their families. A reasonable holiday arrangement helps to:

  • Reduce quality fluctuations caused by pre-holiday fatigue production
  • Ensure stable staff and rapid recovery of production capacity after the holiday
  • Guarantee long-term delivery quality and service continuity

(3) What to Prepare in Advance

Announce the holiday arrangements in advance so that OEMs/ODMs/engineers/partners can prepare and make reasonable adjustments.

  • No new orders will be produced during the holiday.
  • Orders may be concentrated before and after the holiday.
  • Delivery dates, materials, and testing need to be planned in advance.
📅 Get SCSPCBA pre-Chinese New Year production cutoff schedule now!

SCSPCBA printed circuit board manufacturing with Chinese New Year

2. What impact will the 2026 Chinese New Year have on PCB/PCBA/Box Build Assembly projects?

(1) Production Interruptions Due to Shutdowns

Circuit board manufacturing, SMT mounting & DIP, and assembly will be suspended during the holiday.

If orders are not locked in before the holiday, PCBA manufacturing cycles will be delayed. Without advance planning, production delays may occur.

SCSPCBA will prioritize the production and shipment of confirmed orders before the Chinese New Year.

(2) Shipping and Logistics Delays

Logistics partners typically take holidays during the Chinese New Year, leading to extended shipping and customs clearance times.

Customs clearance, transshipment, and last-mile delivery may all be delayed.

International shipping may experience additional delays.

For OEM/OEM customers, even if PCB/PCBA manufacturing/ box build assembly is complete, delivery may be delayed due to logistics holidays.

Get up to $199 off for Chinese New Year now and lock in your order!

3. Practical Guidelines for Customers and SCSPCBA to Cope with Spring Festival Shutdown Challenges

To mitigate the impact of the Spring Festival holiday on printed circuit board production and supply chain, SCSPCBA provides the following practical guidelines:

(1) Develop Production and Delivery Plans in Advance

For OEMs/ODMs/Partners:

  • Confirm Gerber, BOM, and testing requirements with the SCSPCBA team in advance
  • Avoid repeated revisions before the holiday that could lead to scheduling failures
Provide quotations in advance through the PCBA online quotation platform

(2) Increase Pre-Holiday Inventory Reserves

  • For core materials and circuit board components, SCSPCBA will stockpile inventory in advance to avoid supply disruptions or delayed shipments during the holiday.
  • Especially for long-lead-time PCBs and complex PCBAs
Get Online BOM service

(3) Communicate with SCSPCBA in Advance

Many suppliers will also be on holiday. Confirming their shutdown time and material supply capacity in advance can prevent supply chain bottlenecks.

  • Confirm the last order placement time before the holiday.
  • Confirm the fastest resumption of delivery time after the holiday.

SCSPCBA promises:

  • Transparent PCB board production scheduling before the holiday.
  • Prioritizing planned customer PCB/PCBA orders after the holiday.
Contact SCSPCBA now to obtain an order arrangement plan

(4) Consider multi-factory collaborative production

SCSPCBA has factories in multiple locations (Jiangsu, Jiangxi, Shenzhen, and Vietnam PCBA factories), which can:

  • Diversify production risks
  • Optimize delivery plans during the Spring Festival period

Get a PCB/PCBA/Box build assembly quote before the 2026 Chinese New Year

4. Exclusive Pre-Chinese New Year Promotions

To help OEMs, ODMs, and engineering teams complete project planning at a lower cost before the Chinese New Year, SCSPCBA is launching a limited-time pre-Chinese New Year promotion for 2026, allowing you to enjoy real cost advantages while avoiding the risk of work stoppages.

Discount One: Free Stencil

Order any PCB or PCBA project and receive a 100% free SMT stencil.

Applicable to:

  • All PCB/PCBA projects
  • Unlimited quantity, unlimited board type
Online Order Now and Get Your Free Stencil

Discount Two: Plan Ahead for Chinese New Year & Emergency Coupons

Ordering in advance not only avoids the inconvenience of work stoppages during the Chinese New Year, but also grants you exclusive SCSPCBA coupons for all products before the holiday.

Coupon details (All Products):

  • $9 Coupon for Orders $49 or More
  • $19 Coupon for Orders $99 or More
  • $59 Coupon for Orders $299 or More
  • $99 9Coupon for Orders $499 or More
  • $199 Coupon for Orders $999 or More
Get Chinese New Year coupons now!

5. Plan Ahead for Chinese New Year to Gain a Head Start

For SCSPCBA:

Chinese New Year is a crucial time to ensure long-term quality, employee stability, and manufacturing sustainability.

For OEMs/ODMs/Engineers and Purchasing:

Chinese New Year is a critical window requiring advance planning, communication, and resource allocation.

With proper planning, Chinese New Year will not disrupt your project schedule.

Contact SCSPCBA → Ensure Smooth Business Operations During the 2026 Chinese New Year

Get Customized Planning Advice for PCB/PCBA Projects Before the 2026 Chinese New Year

For further assistance, please feel free to call us — we are always ready to help.

call us Tel: +86 (0)755-2561-8511

Search

Latest News

  • Chinese New Year Shutdown 2026
    Chinese New Year Shutdown 2026: How Can Customers and SCSPCBA Prepare Together?January 15, 2026 - 1:00 am
  • Vietnam PCBA Factory Supports OEM & ODM Manufacturing for Global Markets
    How a Vietnam PCBA Factory Supports OEM & ODM Manufacturing for Global MarketsJanuary 10, 2026 - 1:00 am
  • SCSPCBA PCBA MES System
    SCSPCBA MES System: A Unified Manufacturing Execution Platform for PCB & PCBAJanuary 5, 2026 - 1:00 am
  • Best Wishes for the New Year 2026
    Best Wishes for the New Year 2026: Manufacturing Support Continues Without InterruptionDecember 30, 2025 - 1:00 am
  • Box Build Quote Service
    Box Build Quote Service: A Practical One-Stop PCBA Solution for OEM & ODMDecember 30, 2025 - 1:00 am
Chinese New Year Shutdown 2026

Chinese New Year Shutdown 2026: How Can Customers and SCSPCBA Prepare Together?

January 15, 2026
Learn More
https://scspcba.com/wp-content/uploads/2026/01/Chinese-New-Year-Shutdown-2026.webp 400 495 administrator /wp-content/uploads/2024/11/logo.png administrator2026-01-15 01:00:532026-01-15 01:18:24Chinese New Year Shutdown 2026: How Can Customers and SCSPCBA Prepare Together?
Vietnam PCBA Factory Supports OEM & ODM Manufacturing for Global Markets

How a Vietnam PCBA Factory Supports OEM & ODM Manufacturing for Global Markets

January 10, 2026
Learn More
https://scspcba.com/wp-content/uploads/2026/01/Vietnam-PCBA-Factory-Supports-OEM-ODM-Manufacturing-for-Global-Markets.webp 400 495 administrator /wp-content/uploads/2024/11/logo.png administrator2026-01-10 01:00:222026-01-10 01:36:41How a Vietnam PCBA Factory Supports OEM & ODM Manufacturing for Global Markets
SCSPCBA PCBA MES System

SCSPCBA MES System: A Unified Manufacturing Execution Platform for PCB & PCBA

January 5, 2026
Learn More
https://scspcba.com/wp-content/uploads/2026/01/SCSPCBA-PCBA-MES-System.webp 400 495 administrator /wp-content/uploads/2024/11/logo.png administrator2026-01-05 01:00:132026-01-04 09:03:56SCSPCBA MES System: A Unified Manufacturing Execution Platform for PCB & PCBA
Best Wishes for the New Year 2026

Best Wishes for the New Year 2026: Manufacturing Support Continues Without Interruption

December 30, 2025
Learn More
https://scspcba.com/wp-content/uploads/2026/12/Best-Wishes-for-the-New-Year-2026.webp 400 495 administrator /wp-content/uploads/2024/11/logo.png administrator2025-12-30 01:00:512025-12-31 10:38:45Best Wishes for the New Year 2026: Manufacturing Support Continues Without Interruption
Box Build Quote Service

Box Build Quote Service: A Practical One-Stop PCBA Solution for OEM & ODM

December 30, 2025
Learn More
https://scspcba.com/wp-content/uploads/2025/12/Box-Build-Quote-Service.webp 400 495 administrator /wp-content/uploads/2024/11/logo.png administrator2025-12-30 01:00:272025-12-30 01:21:31Box Build Quote Service: A Practical One-Stop PCBA Solution for OEM & ODM

“All-round one-stop” PCBA Manufacturing Solutions

Contact Us

Contact Us

SUCCESS CIRCUITS GROUP LIMITED

Company established 2013 | Manufacturing sites: Shenzhen, Jiangsu, Jiangxi (China); Vietnam | Service centers: Wuhan (China), USA | All statistics are current as of 2026.

Tel: +86 (0)755-2561-8511

Email: [email protected]

US Add: 1363 Lincoln Ave, Suite 1, Holbrook, NY

China Add: Room 203, Building B, No. 229, Wanfeng Middle Road, Wanfeng Community, Xinqiao Street, Bao’an District, Shenzhen

Wuhan Add: Room 602, Ward Center, No.780 Gaoxin Avenue, East Lake High-tech Development Zone, Wuhan, China

PCB Service

PCB Quote

HDI PCB

High TG PCB

Multilayer PCB

High-Frequency PCB

PCBA Service

PCBA Quote

OEM/ODM

One-stop PCBA Service

Testing Inspection

Solution Development

one-stop logistics services, global delivery

Send us mail

socialsocialsocialsocialsocialsocial

Privacy Policy     Shipping Policy     Return and Exchange Policy     Intellectual Property Terms

© 2013 - 2026 | Success Circuits Group Limited | All Rights Reserved.
How a Vietnam PCBA Factory Supports OEM & ODM Manufacturing for Global...Vietnam PCBA Factory Supports OEM & ODM Manufacturing for Global Markets
Scroll to top